Galway Main Drainage
Client: Galway County Council
Project: Galway Main Drainage Stage 3
USA Sewer Survey Value:- €994,000
The aim of this Project was to
- Upgrade the capacity of Mutton Island WWTW including preparation of an EIS.
- Assess the existing sewerage network with regard to structural condition, hydraulic condition, infiltration and operation of storm overflows.
- Prepare outline proposals for rehabilitation of the sewerage network so as to improve the operation of the overall sewerage system and to provide capacity to cater for new developments.
- Prepare outline proposals to extend the sewerage network to cater for new development in areas not currently served with a sewerage infrastructure.
- Development of a wastewater treatment strategy for Galway City Council and Galway County Council for implementation over a 20 year period, in a short, medium and long term structure. This includes proposal for a new Galway East Wastewater Treatment Plant.
- Development of guideline drainage policies.
USA LTD undertook the contract for surveying the manholes and CCTV surveying the sewers for this Project. Survey work commenced in 2004. In total the following was surveyed:
- 8,000 manholes
- 66km of sewer including lateral inspections
- 11 pump stations
- 11 combined sewer overflows
- Flow and load survey
As a result of the survey carried out on the manholes and pipelines a proposal for rehabilitation of sewers and manholes was outlined by USA ltd.